traffic

3. Numbers

Best4Chichester is convinced that, whichever solution results from the consideration of Chichester’s A27 traffic problems. The debate should be conducted in a dispassionate and unbiased manner.

Most importantly, the chosen solution, while meeting the remit of Highways England to provide a major improvement to the Strategic Road Network in the south of England in support of growth in the region, should also provide benefits to the citizens of the City and surrounding region in the long term.

In addition, it should avoid as much disruption as possible during the construction phase.

It is a simple principle, often not taken into account by directly-affected parties, that any new traffic arrangements should aim to provide the greatest benefit for the greatest number. There are two basic choices:

Read more

iStock_000006352344_ExtraSmall

2. Housing

Many local residents are concerned about further housing development as a consequence of A27 improvements.

Two of the leaked options for improvement to the existing A27 to the south of the City involve a new southern link road connecting the Fishbourne roundabout with the roundabout at the junction of the B2145 Selsey and the B2166 Bognor Regis roads.

Read more

S'bridge looking West

1. Traffic Flow

Best4Chichester is concerned at some of the more misleading information being circulated with regard to the proposed improvements to the traffic flow around our City. In the next few weeks we shall be posting a series of articles entitled ‘What’s It About?’  dealing with some of the key topics. This is the first.

The traffic around our City has been worsening for many years. For long and frequent periods, particularly in the summer months and Bank Holidays, and especially when there are major events at Goodwood, congestion is severe, and many people to the south and east of the road are cut off over large parts of the day from Chichester and places beyond .

Read more